Tests performed during CC-Link Conformance Test
1) Noise Tests
Simulator noise test
AC system - 2000K VAC Peak Noise Induced
DC system - 900K VDC Peak Noise Induced
Induced Cable noise test
Floating capacitance measurement test
2) Hardware test
Confirmation of specified communication components
Various Module Power On / Off tests
Various Master Power On / Off tests
Online Module Replacement Tests
3) Software test
Buffer Memory tests
Occupied Stations test
Station Number Verification tests
Master - Slave Communication Handshake tests
Buffer Memory Error Handling tests
Output Status Error Handling tests (if applicable)
Automatic Station Return verification tests
Station Number Overlap tests
Station Number Duplication tests
Station Number Switch out of range test
Baud Rate Switch out of range test
4) Combination test
Maximum Cable Length test
Worst Point network test #1
Worst Point network test #2
Device Interoperability Test
5) Interchangeability test
Profile tests
Device Interchangeability tests
6) Aging test
12 Hour full network operational tests
7) Version 2 extended function tests
Operation at initialization test
Verification of proper sequencing of data packets from Master test
Verification of proper sequencing of data packets to Master test