Conformance Tests

CC-Link/LT

Tests performed during the CC-Link/LT Master Station Conformance Test

     1) Noise Test
              Simulator Noise Test (AC line test)
              Simulator Noise Test (DC line test)
              Cable (bundling) Noise Test


     2) Hardware Test
              Confirmation of Parts in Use
              Confirmation at Power ON
              Replacement of Online Units

     3) Function Test
              Confirmation of Station No./Setup Data
              Error Processing
              Automatic Restore
              Baud Rate, Number of Points Mode, I/O Number of Points Setup Error
              Confirmation of Data Link Stop

     4) Characteristics/Performance Test
              Suspended capacitance Measurement
              Cable Limit Length (communications)
              Confirmation of Minimum Operation Voltage

     5) Aging Test

TOP

Tests performed during the CC-Link/LT Remote I/O Station Conformance Test

     1) Noise Test
              Simulator Noise Test (AC line test)
              Simulator Noise Test (DC line test)
              Cable (bundling) Noise Test


     2) Hardware Test
              Confirmation of Parts in Use
              Confirmation at Power ON
              Replacement of Online Units

     3) Function Test
              Confirmation of Station No./Setup Data
              Error Processing
              Automatic Restore
              Out of Station No. Setting Range
              Confirmation of Data Link Stop

     4) Characteristics/Performance Test
              Suspended capacitance Measurement
              Cable Limit Length (communications)
              Confirmation of Minimum Operation Voltage
              Rush Current Measurement

     5) Aging Test