Tests performed during the CC-Link/LT Master Station Conformance Test
1) Noise Test
Simulator Noise Test (AC line test)
Simulator Noise Test (DC line test)
Cable (bundling) Noise Test
2) Hardware Test
Confirmation of Parts in Use
Confirmation at Power ON
Replacement of Online Units
3) Function Test
Confirmation of Station No./Setup Data
Error Processing
Automatic Restore
Baud Rate, Number of Points Mode, I/O Number of Points Setup Error
Confirmation of Data Link Stop
4) Characteristics/Performance Test
Suspended capacitance Measurement
Cable Limit Length (communications)
Confirmation of Minimum Operation Voltage
5) Aging Test
Tests performed during the CC-Link/LT Remote I/O Station Conformance Test
1) Noise Test
Simulator Noise Test (AC line test)
Simulator Noise Test (DC line test)
Cable (bundling) Noise Test
2) Hardware Test
Confirmation of Parts in Use
Confirmation at Power ON
Replacement of Online Units
3) Function Test
Confirmation of Station No./Setup Data
Error Processing
Automatic Restore
Out of Station No. Setting Range
Confirmation of Data Link Stop
4) Characteristics/Performance Test
Suspended capacitance Measurement
Cable Limit Length (communications)
Confirmation of Minimum Operation Voltage
Rush Current Measurement
5) Aging Test